STEP ONE:
Prepare the site.
Start by digging a shallow trench 4" (100mm) deep by 12"
(300mm) wide. Cut through and remove any sod, roots or large rocks.
For organic loam soils, dig 4" (100mm) deeper and add a leveling
pad of sand or gravel. Now compact and level the soil to receive
the first course of landscape units
|
|
STEP TWO:
Set the base course.
Place and level the first unit with the retaining lip down. Level
each additional unit as you place it, making sure that the outside
edges touch. If your wall contains both straight and curved areas,
start with a straight area and build into the curves. Complete the
base course before proceding to the second course.
|
|
STEP THREE:
Stack and fill. Starting with straight areas first, begin placing
the second course. Center each unit on the seams of the course below
in a running bond pattern as shown. To maintain proper spacing on
curves, remove the outside edges of the retaining lip as required.
Now proceed to the next layer, backfilling as you go. For drainage
behind the wall, clean gravel or crushed stone is recommended.
|
|
| To remove outside lugs or edges of retaining lip, hold unit securely
or place at angle on ground. Srike the lug firmly with a hammer. Always
wear safety glasses to protect eyes from chips. |
|
|